/00

Case Study: Oil Refinery

No More Missing Crude: How Subatix found barrel leakage and turned it into throughput

Client

Independent 80kbd refinery with focus on CDU/VDU and hydrotreaters operations

/01

Outcome

Total Indicative Financial Outcome

$7-8M/yr in rate uplift only; plus, energy savings & off-spec avoidance

/02

Why they decided to try Subatix?

The Challenge

Shareholders set targets and triggered need to find leaking barrels

The Gap

Ops team didn't have enough capacity and capabilities to build a clear perspective on improvement opportunities and what to go after first

The Need

They wanted data-backed picture of their operations and how it can be improved

The Solution

With Subatix ops team build solid baseline, identified leaking barrels and designed a plan to capture them

/03

What we did, in 4 weeks

/01Built the fact base: Benchmarked CDU/VDU and key interfaces against 250+ internal peak windows, mapped 130+ cross-unit linkages, and quantified improvement potential
/02Configured Subatix to site realities (tags, limits, operating regimes) and onboarded the operations team
/03With Subatix, the team worked through 35+ primary root causes and assembled a proof-backed opportunity pack covering >75% of the initial improvement potential + 20-30 root causes were marked for further analysis

/04

What we found

Throughput uplift (stream-day basis)

+4.18 kb/d

Two-phase utilization lift from 90.9% (~74.54 kb/d) → 93.7% (~76.83 kb/d) → 96.0% (~78.72 kb/d) = +4.18 kb/d total.

Quality (desalter)

Salts: 11.9 → ≤6.2 ptb | Chlorides: 8.8 → ≤4.7 ppm

Targeting ≥95% hours in-spec via online analyzers, alarm bands, and SOP discipline.

Stability (make high-rate days stick)

Daily crude CV: 15–20% → ≤5–7%

By coordinating combustion & column ΔT (stabilize 8–12°F → ≤3–4°F) and lifting APC on-hours ≥85%.

Energy (refinery-native)

EII: −3 to −5 points | SFC: −3–5%

≈ heater efficiency +3–5 pp via advanced combustion control, excess-air management, and heat-integration tuning.

Reliability

On-stream: +3–5 pp | Unplanned downtime: −30–40%

To support sustained higher utilization.

/05

Result

Subatix delivered a Single-Source of Trust validated improvement opportunity backlog backed by ops logs and an operations intelligence workspace to build improvement initiatives. Early actions are already lifting throughput to capture additional barrels.